Autosoft Journal

Online Manuscript Access


Rail Mounted Gantry Crane Scheduling In Rail2013Truck Transshipment Terminal


Authors



Abstract

Rail mounted gantry crane (RMGC) scheduling is vital to handling efficiency in rail-truck transshipment terminals. In this paper, we propose an optimization model for RMGC scheduling problem based on a dual cycle mode. A genetic algorithm is designed to obtain the optimization handling sequence. Computational experiments on a specific rail-truck transshipment terminal show that the proposed method is effective to solve RMGC scheduling problems in rail-truck transshipment terminals.


Keywords


Pages

Total Pages: 13
Pages: 61-73

DOI
10.1080/10798587.2015.1041764


Manuscript ViewPdf Subscription required to access this document

Obtain access this manuscript in one of the following ways


Already subscribed?

Need information on obtaining a subscription? Personal and institutional subscriptions are available.

Already an author? Have access via email address?


Published

Volume: 22
Issue: 1
Year: 2015

Cite this document


References

https://doi.org/10.1007/s1-009-0105-0

Bierwirth, Christian, and Frank Meisel. "A Survey of Berth Allocation and Quay Crane Scheduling Problems in Container Terminals." European Journal of Operational Research 202.3 (2010): 615-627. Crossref. Web. https://doi.org/10.1016/j.ejor.2009.05.031

Boysen, Nils, and Malte Fliedner. "Determining Crane Areas in Intermodal Transshipment Yards: The Yard Partition Problem." European Journal of Operational Research 204.2 (2010): 336-342. Crossref. Web. https://doi.org/10.1016/j.ejor.2009.10.031

Boysen, Nils, Malte Fliedner, and Michael Kellner. "Determining Fixed Crane Areas in Rail-rail Transshipment Yards." Transportation Research Part E: Logistics and Transportation Review 46.6 (2010): 1005-1016. Crossref. Web. https://doi.org/10.1016/j.tre.2010.05.004

Chang, Daofang et al. "Developing a Dynamic Rolling-Horizon Decision Strategy for Yard Crane Scheduling." Advanced Engineering Informatics 25.3 (2011): 485-494. Crossref. Web. https://doi.org/10.1016/j.aei.2011.02.003

Chung, S.H., and K.L. Choy. "A Modified Genetic Algorithm for Quay Crane Scheduling Operations." Expert Systems with Applications 39.4 (2012): 4213-4221. Crossref. Web. https://doi.org/10.1016/j.eswa.2011.09.113

Crainic T. G. Handbooks in Operations Research and Management Science https://doi.org/10.1016/S0927-0507(06)14008-6

Daganzo, Carlos F. "The Crane Scheduling Problem." Transportation Research Part B: Methodological 23.3 (1989): 159-175. Crossref. Web. https://doi.org/10.1016/0191-2615(89)90001-5

He, Junliang et al. "A Hybrid Parallel Genetic Algorithm for Yard Crane Scheduling." Transportation Research Part E: Logistics and Transportation Review 46.1 (2010): 136-155. Crossref. Web. https://doi.org/10.1016/j.tre.2009.07.002

Kim, Kap Hwan, and Young-Man Park. "A Crane Scheduling Method for Port Container Terminals." European Journal of Operational Research 156.3 (2004): 752-768. Crossref. Web. https://doi.org/10.1016/S0377-2217(03)00133-4

Li, Wenkai et al. "A Continuous Time Model for Multiple Yard Crane Scheduling with Last Minute Job Arrivals." International Journal of Production Economics 136.2 (2012): 332-343. Crossref. Web. https://doi.org/10.1016/j.ijpe.2011.12.020

Liu, Jiyin, Yat-wah Wan, and Lei Wang. "Quay Crane Scheduling at Container Terminals to Minimize the Maximum Relative Tardiness of Vessel Departures." Naval Research Logistics 53.1 (2005): 60-74. Crossref. Web. https://doi.org/10.1002/nav.20108

Moccia, Luigi et al. "A Branch-and-Cut Algorithm for the Quay Crane Scheduling Problem in a Container Terminal." Naval Research Logistics 53.1 (2005): 45-59. Crossref. Web. https://doi.org/10.1002/nav.20121

Ng, W.C. "Crane Scheduling in Container Yards with Inter-Crane Interference." European Journal of Operational Research 164.1 (2005): 64-78. Crossref. Web. https://doi.org/10.1016/j.ejor.2003.11.025

Ng, W.C., and K.L. Mak. "Yard Crane Scheduling in Port Container Terminals." Applied Mathematical Modelling 29.3 (2005): 263-276. Crossref. Web. https://doi.org/10.1016/j.apm.2004.09.009

Ng, W. C., and K. L. Mak. "Quay Crane Scheduling in Container Terminals." Engineering Optimization 38.6 (2006): 723-737. Crossref. Web. https://doi.org/10.1080/03052150600691038

https://doi.org/10.1007/sl0951-007-0029-5

Tavakkoli-Moghaddam, R. et al. "An Efficient Algorithm for Solving a New Mathematical Model for a Quay Crane Scheduling Problem in Container Ports." Computers & Industrial Engineering 56.1 (2009): 241-248. Crossref. Web. https://doi.org/10.1016/j.cie.2008.05.011

Zhang, Chuqian et al. "Dynamic Crane Deployment in Container Storage Yards." Transportation Research Part B: Methodological 36.6 (2002): 537-555. Crossref. Web. https://doi.org/10.1016/S0191-2615(01)00017-0

JOURNAL INFORMATION


ISSN PRINT: 1079-8587
ISSN ONLINE: 2326-005X
DOI PREFIX: 10.31209
10.1080/10798587 with T&F
IMPACT FACTOR: 0.652 (2017/2018)
Journal: 1995-Present




CONTACT INFORMATION


TSI Press
18015 Bullis Hill
San Antonio, TX 78258 USA
PH: 210 479 1022
FAX: 210 479 1048
EMAIL: tsiepress@gmail.com
WEB: http://www.wacong.org/tsi/