Autosoft Journal

Online Manuscript Access


Study on On-site Monitoring of Hydration Heat of Mass Concrete for Bridge Slab Based on Measured Data


Authors



Abstract

Plagued by consistent temperature cracks caused by hydration heat of mass concrete construction, a lot of research on concrete DAMS and other large hydraulic concrete, the theory also more deeply, and for large span bridge foundation pile caps, corresponding much smaller size of mass concrete, the related research is less. This article obtains from the cooling water pipes "embedded" scheme optimization, based on the new Tianjin Haihe river bridge project as the engineering background, construction of the concrete hydration heat temperature rise theory model was set up, with the help of theory formula, the numerical simulation and field measurement, the hydration heat of concrete control method is founded by the test.


Keywords


Pages

Total Pages: 9

DOI
10.31209/2019.100000081


Manuscript ViewPdf Subscription required to access this document

Obtain access this manuscript in one of the following ways


Already subscribed?

Need information on obtaining a subscription? Personal and institutional subscriptions are available.

Already an author? Have access via email address?


Published

Online Article

JOURNAL INFORMATION


ISSN PRINT: 1079-8587
ISSN ONLINE: 2326-005X
DOI PREFIX: 10.31209
10.1080/10798587 with T&F
IMPACT FACTOR: 0.652 (2017/2018)
Journal: 1995-Present




CONTACT INFORMATION


TSI Press
18015 Bullis Hill
San Antonio, TX 78258 USA
PH: 210 479 1022
FAX: 210 479 1048
EMAIL: tsiepress@gmail.com
WEB: http://www.wacong.org/tsi/